Site Preparation Guide
Delivery Conditions
The server is delivered 24 hours in advance of the scheduled installation date.
On arrival, the server must be placed, in its packing, in the Computer Room so that it
reaches room temperature before powering up (optimum operating temperature = 22° C +
3° C, hygrometry = 50% + 5%).
Warning:
To avoid incorrect handling, the server must be removed from its packing by authorized
Customer Service Engineers only.
Carry-In Route
The route from the unloading bay to the Computer Room must be checked to ensure that the
server can be carried into the premises easily and that floors can support temporary
overloads during delivery. See Appendix A Specifications.
The Sales Department or local Customer Service Department will draw up an Access Sheet to
ensure correct delivery.
CAUTION:
It is mandatory for the server to be transported vertically.
The server is extremely heavy and requires the use of an elevator.
The Data Processing Site manager must allocate enough personnel to ensure safe handling of
the server.