4-2
Site Preparation Guide
DANGER
To ensure the protection of personnel and equipment, bipolar magneto-thermic circuit
breakers must be installed on the phase and neutral wires, in compliance with the safety
standards in force.
Power must be exclusively conveyed by copper conductors from the source. Aluminium
conductors are prohibited. It is mandatory to separate the power supply for the server
from the non-computing power supply.
Cabling Requirements
The Customer is responsible for providing the dedicated power supply to the base of the
cabinet. As equipment in Data Processing Centers is moved frequently, standards require the
use of flexible power cables.
One power supply cable, per PDU/UPS and/or CSS Module, must be routed by the
Customer to the cable cut-out at the base of each cabinet, or for UPS 7.5 KVA & 10 KVA,
into hard wire receptacle in the side.
Important:
Each Power Distribution Unit (PDU) and the UPS require an extra cable length of 1.5 meters
for connection inside the cabinet.
The Central Subsystem (CSS) Module cable length allows connection in the plenum space at
the base of the cabinet.
Note:
See Appendix A for details.
CAUTION:
It is mandatory for power lines and terminal boxes to be located within the immediate
vicinity of the system and to be easily accessible.
Each power line must be connected to a separate, independent electrical panel and bipolar
circuit breaker.
France:
Power sockets and plugs must be compliant with Decree 88-1056 Article 20-IV, dated 14th
November 1988.
Warning:
Cables must be correctly labeled at both ends with the following information:
the device to which each cable end is being connected,
the physical location of the other end of the cable (ID: building, floor, column, ...),
the length of the cable run.
The Customer is responsible for ensuring that the AC electricity supply is compliant with
national and local recommendations, regulations, standards, and codes of practice.